Solar panels in Curaçao: rules, costs, installers and after-sales
Solar can replace substantial grid power in Curaçao, but the result depends on self-consumption, the monthly PV fee, exports, roof, battery and service. This guide uses rules and tariffs applicable on 27 November 2026. It does not rank suppliers without comparable quotations. It provides a transparent scenario, the full public RAC list of 44 recognised individuals, twelve businesses with verifiable sites, and an after-sales checklist.
Going soon? Start now and land knowing the island.
Dossier · updated
- Cg 0,25/kWhis the 2026 export payment; it is not equal to the household retail price.
- Cg 8/kWp/mndis the fixed household monthly fee per installed kWp.
- 18,4 MWpwas registered on 1,132 systems by 31 October 2025; Aqualectra estimated about 30 MW total.
- 44individuals appear in the public RAC recognised-PV-installer register.
1. Your solar buying guide
Start with grid-tied solar and daytime self-use.
2. Calculate your savings
Illustration for a grid-connected household at one selected avoided rate. Cg 0.25 export and Cg 8/kWp/month. Excludes maintenance, financing and replacements.
3. Compare providers
Select three companies. Published terms, not independently tested performance.
| Solar Heroes | ZonZeker Curaçao | Ecofarm Curaçao | |
|---|---|---|---|
| Workmanship warranty | 5 years | 5 years | 5 years |
| Inverter warranty | Not published | 10 years | Not published |
| Battery warranty | Not published | 10 years | Not published |
| Response to fault | Usually within 1 hour | Within 1 working day | Not published |
| Maintenance / service | Maintenance stated | Maintenance stated | Third-party service stated |
| Price | Quote required | Quote required | Quote required |
| Source ↗ | Source ↗ | Source ↗ |
Response is not repair time; confirm warranty terms by model and contract.
4. After-sales: before signing
0 / 55. Battery: how long will backup last?
90% usable, 92% conversion, no solar recharge; sufficient inverter power required.
Research details
Rules
Rules first: obtain a declaration of no objection before installation
For grid-connected PV, the owner and PV installer submit information to RAC. After review RAC may issue the Declaration of No Objection. The form is not submitted digitally. A UOOW-recognised electrical installer supervises the work; UOOW inspects the electrical extension and Aqualectra the grid connection and protection settings.
The revised policy applies from 29 October 2025. Before paying, ask who files the declaration, who the recognised electrician is, who arranges inspection and which costs are excluded. A generic ‘certified’ claim is insufficient: check the responsible person's name in the RAC register.
System
On-grid, hybrid or off-grid?
On-grid usually lowers daytime grid use but does not automatically provide power during an outage. Hybrid adds a battery and can support selected circuits if inverter, transfer and design allow it. Off-grid must cover poor-production days and needs much more careful sizing.
Do not choose on battery capacity alone. Ask for usable kWh, continuous and surge power, warranty, temperature limits, ventilation, fire safety, monitoring and local replacement. Specify in writing which loads work during an outage and for how long.
Register
Full public RAC register: 44 individuals
RAC lists the following people as recognised PV installers. The page gives names but no certificate-expiry date, phone, employer or complaints history. Recheck the live RAC page and put the responsible name on the quotation and declaration.
Eli-Melech Sinclair José Alves · Julius S. Balentien · Dennis Leonard Benilia · Ruchendley Bernadina · Willem Theodorus Anne Blijstra · Mario Bonnet · Niels Andreas Petrus Caminada · Gerfrym Cijntje · Farley Steven Croes · John F. Dammers · Jose-Luis dos Santos Gonçalves · Patrick Emerencia · Albert J. Fecunda · José Galmeijer · Roque Gouverneur · Bienvenido Gressmann · Johannes van der Gulik · Gerard Antonius Maria Harmsen · Clint Hersilia · M. ter Horst · Norman van Holst · Kevin Edward Houser · Humphrey Bernard Leonard Inacio · Eric Amacio Inecia · German V. Isidora · Marcus Daniël Istatia · Fausto Kirindongo · Silvester Evedson J. Koeijers · Erwald Johannes La Croes · John Loefstop · Gerard van Lohuizen · Nacor Damian Maduro · Kenneth J. Maria · Shanto Quirindongo · Lionel Ambrosio Rafaela · Lester Regales · Rayner Ricardo · Franklin Johan Rosheuvel · Robert Walter Schnog · Renaldus T.M. Spaans · Virgil Placidus Velder · Fenton Wagino · David ten Westened · Lucien Vincentius Whyte
After-sales
After-sales: buy repairability, not only panels
Before signing, put seven answers in the quote: who responds, response time, call-out and diagnosis cost, who files manufacturer claims, which parts are stocked locally, what happens when a model disappears, and who pays labour, transport and lifting under warranty.
Require a handover file with serial numbers, datasheets, wiring/protection photos, declaration, inspection report, single-line diagram, monitoring ownership, configuration backup, and written warranties for panels, inverter, battery, mounting and labour. You should control the monitoring account.
Set both response and repair targets for diagnosis, temporary solution and permanent repair. Define safe shutdown for corrosion, leaks, error codes, battery alarms and storm damage. Request a written one-year yield, connector, mounting, corrosion and error-log check.
Read exclusions for salt, moisture, ventilation, surge, hurricane, pests, firmware, internet and maintenance. A long manufacturer warranty is weak without a local claim route, available parts and affordable labour. Compare the full repair path, not only years or purchase price.
The table below compares only what providers published on their own sites on 27 November 2026. We did not test response times and found no statistically useful independent multi-year customer cohorts. ‘Unknown’ means not publicly confirmed, not necessarily unavailable.
| Provider | Local team & response | Warranty, labour & parts | Monitoring & maintenance | Transfer & experience |
|---|---|---|---|---|
| Solar Heroes ↗ | Site claims local team and usual response within an hour; not independently tested. | 5-year workmanship; manufacturer warranties per quote. Exclusions include storms, poor maintenance and unauthorised repair. | Maintenance packages; monitoring in one package and annual maintenance in another. | Transferability and independent multi-year evidence: unknown. |
| Ecovolt Curaçao ↗ | Local repair and maintenance stated; response time unknown. | No concrete public warranty, labour cover or local parts stock found. | Monitoring solutions and ongoing support stated. | Transferability and independent multi-year evidence: unknown. |
| JGM Installation Company ↗ | Local address and phone; service and maintenance stated. Response time unknown. | Site states one-year warranty on jobs; solar scope and parts coverage are unclear. | Service contracts and routine maintenance stated, but solar-specific scope is not fully public. | Transferability and independent multi-year evidence: unknown. |
| Ecofarm Curaçao ↗ | Local inspection, measurements and repair stated; response time unknown. | Five-year installation warranty plus manufacturer warranties; labour, call-out and materials may be charged outside cover. | Inspection, performance data, third-party-system baseline and annual checks stated. | Third-party service is stated; transferability and independent multi-year evidence unknown. |
| Premier Solar Solutions ↗ | Local provider; no public response time found. | Site states battery 5 years, panel 10-year manufacturer/25-year performance and Deye inverter 5 years; labour and parts logistics unknown. | Visual inspection once or twice yearly advised; public maintenance contract and monitoring unknown. | Transferability, third-party service and independent multi-year evidence: unknown. |
| Kooyman Curaçao / Lure ↗ | Kooyman sells; Lure is named for installation/service. No concrete public response time. | Five-year workmanship, panels 12 years, inverter 5 and battery 7 stated; claim assistance subject to agreement. | Lure maintenance contract, cleaning, app/web monitoring and ongoing support stated. | Transferability, third-party service and independent multi-year evidence: unknown. |
| ZonZeker Curaçao ↗ | Site claims its own Curaçao technicians, no subcontractors and contact within one working day; not independently tested. | Panels 25-year performance, inverter 10 extendable, battery 10 and workmanship 5 stated. | Monitoring and remote resolution stated; maintenance scope not fully public. | Transferability, third-party service and independent multi-year evidence: unknown. |
| Zon Opslag Curaçao ↗ | Wholesaler with local stock; not an installer. End-customer response time unknown. | Site states battery 10 years and panel performance 25; labour and installation-claim route unknown. | Wi-Fi monitoring stated; maintenance service not publicly confirmed. | Installers can source parts; transferability and independent multi-year evidence unknown. |
| Lure Energy ↗ | Site states 24/7 hotline and guaranteed response times but gives no duration. | Panels 12 years, batteries 7 and inverters 5 stated; verify labour and parts terms in contract. | Full maintenance, cleaning, performance checks, reporting, monitoring and preventive diagnostics stated. | Transferability, third-party service and independent multi-year evidence: unknown. |
| renu energy Curaçao ↗ | Local operations and maintenance stated; response time unknown. | Manufacturer warranties stated; site says it handles spare and replacement parts. Labour cover unknown. | Real-time monitoring and lifetime asset support stated. | Transferability, third-party service and independent multi-year evidence: unknown. |
| IFA Solar Energy ↗ | Local service stated; response time unknown. | Repair of panels, inverters and batteries stated; no concrete public warranty, labour or parts stock found. | Maintenance, cleaning, monitoring and ongoing service stated. | Transferability, third-party service and independent multi-year evidence: unknown. |
| Zonvoornix ↗ | Service channel and complaint route stated; Curaçao technicians and response time not publicly confirmed. | Panels 25-year product/30 performance, inverter 5, battery 10 and workmanship 12 months stated. Repair first; investigation costs may apply outside cover. | Monitoring and maintenance contract not publicly confirmed; unauthorised work may affect warranty. | Third-party work may affect cover; transferability and independent multi-year evidence unknown. |
Use this as a quote checklist, not a ranking. Ask each provider to complete missing fields in writing. A configurable 30% after-sales weight is a user preference, not a proven quality ranking.
Roof & climate
Curaçao conditions: salt, heat, wind and roof
Before quoting, inspect shading, structure, waterproofing, wind load, anchors, cable route, earthing, surge protection and access. Ask about mounting material, corrosion class and separation of dissimilar metals. A panel warranty does not repair a leaking roof.
Install inverter and battery within manufacturer temperature, moisture, ventilation and clearance limits. Label isolation. Base cleaning on data and soiling, not a random schedule, and inspect after severe weather.
Choice helper
Choice helper: make three quotations comparable
Start with twelve months of bills and a day/night profile. Ask three providers the same brief: backup power, critical loads, roof, self-use target and battery choice. Require kWp, annual kWh and assumptions, usable battery kWh, all models, installation, declaration/inspection, fixed costs, monitoring, maintenance and after-sales separately.
Compare one formula: avoided retail electricity by band + Cg 0.25 exports – Cg 8/kWp/month – maintenance/finance. Ask for low, middle and high production. Decide only after responsible recognised names, documents and repair route are written.
Open data
Open data: registered is not the same as installed
The Curaçao Energy Report counts 1,132 registered systems and 18.4 MWp at 31 October 2025. Aqualectra estimates about 30 MW at homes and businesses. The 11.6 MW gap equals 63% of registered capacity, but does not prove exactly 11.6 MW is illegal: 30 MW is an estimate and direct self-use is not measured.
Registered capacity rose from 11.9 MWp in 2018 to 18.4 in 2025. Only 230 kWp was added in 2025 versus 1,520 in 2024. Solar exported to the grid was 8.8 GWh, 0.9% of production. The open-data article preserves these definitions and calculation.
Frequently asked questions
What is the 2026 solar export payment?
Cg 0.25/kWh, plus a household fixed fee of Cg 8 per installed kWp each month.
Who may install solar in Curaçao?
RAC requires a personally recognised PV installer; a UOOW-recognised electrician supervises the electrical extension. Check both names and the declaration route.
What should solar after-sales include?
Written response and repair targets, local parts, warranty route, labour/transport costs, customer-controlled monitoring, configuration backup and a complete handover file.
Sources
- RAC: teruglevertarieven duurzaam opgewekte elektriciteit 2026 ↗ · Dec 1, 2025
- RAC: tarieven elektriciteit en water per 1 november 2026 ↗ · Oct 1, 2026
- RAC: aanvraagprocedure Verklaring van Geen Bezwaar ↗ · Nov 27, 2026
- RAC: beleid kleinschalige duurzame energie, geldig vanaf 29 oktober 2025 ↗ · Oct 29, 2025
- RAC: openbaar register erkende PV-installateurs ↗ · Nov 27, 2026
- RAC: Curaçao Energy Report 2025 ↗ · Nov 23, 2026
Together, let’s find the best installers.
Solar Heroes
Ecovolt Curaçao
JGM Installation Company
Ecofarm Curaçao
Premier Solar Solutions
Kooyman Curaçao / Lure
ZonZeker Curaçao
Zon Opslag Curaçao
Lure Energy
renu energy Curaçao
IFA Solar Energy
Zonvoornix
Follow this?
Sign up for a heads-up on every new fact. Every new fact about Zonnepanelen Curaçao in your inbox the next morning, with the source. Free, stop with one tap.
Free. Stop with one tap. We never share your details.
On this topic
What is the order for solar with feed-in in Curaçao?
Design → RAC VvGB before installation → build → UOOW/Aqualectra inspection → stamped inspection card → connection agreement and documents to Aqualectra → metering/grid connection, then settlement.
Source: RAC forms · RAC policy
Which solar setup suits a Curaçao vacation home?
Savings: usually grid-tied. Backup: hybrid with battery and safe isolation equipment. Off-grid: only after local sizing and inspection checks. Compare self-consumption, outage needs and aftersales.
Source: RAC 2026 feed-in tariffs · RAC 2025 policy
From the editorial team
Ask
Ask me anything5 questions today
Everyone can see it. No links, phone numbers or ads.
Comments
Know more or see it differently? Your comment goes up right away.
Free · 1 tap · stop anytime
Are you on Curaçao?
Tell us and every morning mail fits your trip.
Thanks. Your morning mail now fits your trip.